RUCKUS ICX 8200 Campus Switches
Product Detail
Ruckus ICX8200 Campus Switch
The RUCKUS ICX 8200 Switch series is purposely designed to handle next generation wireless first and IoT campus networks. These intelligent, scalable edge switches deliver enterprise-class functionality at an affordable price without compromising performance and reliability. The RUCKUS ICX 8200 raises the bar with up to 8×25GbE ports for uplinks or stacking, PoE++ (802.3bt), VXLAN, advanced L2/L3 features and market-leading stacking density with up to 12 switches per stack. In addition, the RUCKUS ICX 8200 combines enterprise-class features, manageability, performance, and reliability with the flexibility, cost-effectiveness, and “pay as you grow” scalability of stackable solution;
Note: This page also includes the RUCKUS ICX8200 AV variant switches
- Model Name:
- ICX-8200
- Product Family:
- RUCKUS ICX Switches
- Recommended Software:
- Stability Release:
- Notes:
Ruckus ICX software currently has two release types; Stability and Technology.
We recommend all customers utilize the Stability Release if it contains all needed features for your network. A Technology Release should only be used if your network requires new features not available in the Stability Release.
RUCKUS One (cloud) users: Please check the 'Version Management' page within your RUCKUS One GUI for your recommendation
How to generate a SSL/TLS key and connection between SDN and Campus ICX Switches for lab testing?
How do I generate a SSL/TLS key and connection between a Brocade SDN Controller and Campus ICX Switches/MLX Routers for lab testing?
Installing PoE firmware with TFTP - Brocade Campus Network Switches
Installing PoE firmware with TFTP - Brocade Campus Network Switches
Upgrade path for ICX Switches
Upgrade-path-for-ICX-Switches
Troubleshooting Fiber/ SFP/ SFP+ connection issues on RUCKUS ICX Switches and networks in general
Addressing Fiber and Transceiver Connection Problems, where peer-to-peer fiber connections often fail to establish despite successful cable tests or new cable installations.
Common... (continued)
Managing User Accounts in Brocade Campus Network Switches
Managing User Accounts in Brocade Campus Network Switches
VLAN configuration on Ruckus ICX switches for Ruckus Wireless WLAN's
Adding untagged & tagged vlan on the same switch port on Ruckus ICX switch.
Connectivity Challenges: SSH, Telnet, and Web Access Issues on 8200 Switches Post Power Outage
This article addresses connectivity issues that arise after a power outage with 8200 switches running early versions of 10.0.10. Specifically, users may experience disruptions in SSH,... (continued)
Is there a default password for Ruckus ICX Switches?
Except for Console or Telnet access, prior to FI 08.0.90 admins had to enable authentication and a UserID/PW for SSH and WebUI access.
How to Troubleshoot Ports Flapping on Ruckus ICX Switches
• Review logs for errors or warnings related to the port.
• Inspect cables, transceivers, and check for speed/duplex mismatches.
• Check for STP issues and broadcast storms.
• Test... (continued)
The licensing features available on Ruckus Switches
Article has got information about the different types of licensing and their features available on Ruckus Switches
What Ethernet SFP Optics are compatible with Ruckus ZD, SmartZone, ICX switches, and AP products?
Only the 1/10G SFP+ SR Transceiver on Ruckus price sheet has been tested by our QA on Ruckus SZ appliances.
Only the 100Mbe / 1GigE / 10GigE / 40GigE / 100GigE tranceivers on Ruckus... (continued)
Step by Step Guide to Configuring OSPF Authentication on Ruckus ICX Switches
Step by Step Guide to Configuring OSPF Authentication on Ruckus ICX Switches
How to disable auto-upgrade firmware feature on Ruckus one for ICX switches
The customer may not feel comfortable allowing ICX switches to auto-upgrade to Ruckus One's recommended firmware. This KBA is helpful for disabling the auto-upgrade feature for ICX... (continued)
ICX 7000 Switches PoE Version Issue After Upgrade - TSB 2021-001
ICX 7000 series member unit with PoE firmware version showing 00.0.0 after upgrade to RUCKUS ICX FastIron software releases 8.0.95, 8.0.95a, or 8.0.95b (Defect # FI-223444)
Factory reset button not working on ICX switches
Factory reset button functionality is not working on ICX switches.
Why ICX7150 switches encounter communication issues with Microsoft NLB?
Customer replaced HP switches with ICX7150 and started experiencing communication issues with Microsoft NLB
FLOW MOD ERROR in ICX Switches
In an untagged Hybrid Port, Flow must be added with the VLAN ID field.
Brocade Campus ICX - DHCP Auto-provisioning
DHCP Auto-provisioning
Brocade Campus ICX - ERSPAN Configuration
ERSPAN ENCAPSULATED REMOTE SWITCHED PORT ANALYZER
Brocade Campus ICX Logging Parameters
How to change the number of syslog entries, enable persistence, log to console and log to a remote syslog server.
Brocade Campus ICX Reload Parameters
How to use the reload after and reload at commands?
Brocade Campus ICX GRE TUNNEL Configuration
Brocade Campus ICX GRE TUNNEL Configuration
How to configure OSPF in Brocade Campus network Switches
How to configure OSPF in Brocade Campus network Switches
ICX switches won't sync with RWG with error "Unable to establish a connection to this device"
Customer have multiple switches added to RWG and would like to enable sync on them so that they could control ICX config using the RWG. When attempting to generate the Config diff for... (continued)
FAQ on ICX6610 PSU's
FAQ on ICX6610 PSU's
Procedure to add stack switches to the RUCKUS One
These steps to be followed to add stack switches in the RUCKUS One
License transfer between switches
Articles describes about what needs to be done in order to transfer the licenses from one switch to the other.
How to configure CLI Profile on R1 when multiple ICX switches are provisioned with static IP addresses
This article describes the steps for provisioning multiple Ruckus ICX switches with static IP address using a CLI configuration profile on R1.
Unable to securely copy SCP Config or supportsave via SCP on ICX 7xxx series switches (TSB-2019-005-A)
Until FI 08.0.90d we are unable to securely copy SCP Config or supportsave via SCP on ICX 7xxxx switches.
ICX - Collecting a SupportSave
ICXCampus - Collecting a SupportSave
Brocade Campus ICX - Configuring FDP AND CDP
Brocade Campus ICX - Configuring FDP AND CDP
Brocade Campus ICX - ENERGY EFFICIENT ETHERNET (EEE)
ENERGY EFFICIENT ETHERNET (EEE) CONFIGURATION
BROCADE CAMPUS ICX LLDP AND LLDP MED DISCOVERY PROTOCOLS
BROCADE CAMPUS ICX LLDP AND LLDP MED DISCOVERY PROTOCOLS
BROCADE CAMPUS ICX VLAN MIRROR AND MONITOR
BROCADE CAMPUS ICX VLAN MIRROR AND MONITOR
Configuring Link Aggregation between Juniper EX switches and Ruckus APs
The attached guide helps configure link aggregation on Juniper EX switches for 802.11ac wave 2 R710 (and later model) APs.
Why ICX 7150 and ICX 7650 switches do not retain clock date and time upon power cycle?
ICX 7150 and ICX 7650 switches do not retain clock date and time after power outage
Issues with Pre-standard PoE phones on ICX switches
Use the 'legacy-inline-power' command on ICX switches to be sure of Pre-standard PoE phone compatibility
How many ICX switches can we connect to a SmartZone 5.0 Cluster?
See details in the Release Notes and Getting Started Guide for ICX switch count per SZ type cluster.
How to configure encrypted radius in ICX switches on 08.0.30
Details of command-line parameters for configuring encrypted RADIUS
Required data for PoE troubleshooting on ICX Switches
Required data for PoE troubleshooting on ICX Switches.
Configuring VLANs for APs and SSIDs on ICX Switches
To ensure optimal performance and security on most networks, it's crucial to configure your switches and Access Points (APs) correctly. This article explains the configuration... (continued)
Configuring LACP for R710 on Ruckus ICX 7450
Configuration guide for LACP on Ruckus ICX7450 switch for R710 (ACw2) model APs.
How to configure SSH on Ruckus ICX?
How to configure SSH on ICX switch
ICX 7450 BiDi Stacking?
Stacking using 40 GbE BiDi transceivers is only supported on the 7750s, not on 7450s.
PD detection fault on several switches with Aruba AP second port
PD detection fault on several switches with Aruba AP second port
Collecting a Show Tech-Support on ICX Switch
Collecting a Show Tech-Support on ICX Campus Edge Switch.
Looking for switching image on ICX8200
The customer wanted to have a switch code on an ICX8200.
How to upgrade POE firmware on FastIron switches using Brocade Network Advisor?
How to upgrade POE firmware on FastIron switches using BNA?
Ruckus ICX - Local DB user authentication does not work for Web Auth.
Local DB user authentication does not work for Web Auth
What are the licenses available for Ruckus ICX 7250 switch?
The licenses available for ICX 7250 switch
ICX Campus Switches/FastIron Licensing FAQs posted
We have heard from a number of customers and partners who are experiencing some difficulties with the transition from the legacy Brocade licensing tool (Brocade Software Portal) to the... (continued)
How do I stack two ICX7150 switches?
Hello everyone,I'm a novice at best, really a simple DIY'er. Amazon installed a Ruckus ICX7150 switch in my smart panel and I have an acces point upstairs and another downstairs. Since... (continued)
SmartZone and ICX Switches
I'm getting ready to turn up a new site of 100 H510 Access Points. We are also using ICX 7150 Switches and a RXG Gateway. Does anyone know when I add these Access Points to SmartZone... (continued)
ICX Switches - Integrate with Ruckus Cloud platform?
Can the ICX switches fully integrate with Ruckus Cloud?I have been using the Ruckus cloud platform and wanted to know if the ICX switches could be managed via the cloud portal?I have... (continued)
ICX 7250 stack switches rebooting
I updated to 8090 UFI on my ICX 7250s in most of the stacks unit 1 stays up but units 2 and 3 show that the have restarted sometime recently. Found this because my AP report... (continued)
Announcement: Ansible Modules for ICX 7000 Model Switches
Greetings, Ruckus is pleased to provide ICX 7000 model switch support thru Ansible Modules 1.0,now available on the Support Portal at these links for Install/Execute Release... (continued)
ICX Switches seem to Loop when setting SZ-Active
Good Afternoon,Has anyone seen an issue where ICX switches running various Firmware will boot loop after being joined to an SZ server?if I unplug the switch from the internet or disable... (continued)
SNMP v3 is not working properly in ICX6450 switches
can you please share the valid configuration of SNMP ver3 in ICX6450 as I configured it but the SNMP agent did identify or get data from my switches
QoS for VoIP on ICX switches
Hello all,I'm trying to set up some basic QoS functionality on a number of ICX7150 switches. I have all of my phones in a particular vlan and would like to have the switch mark... (continued)
Help with setting up VLAN trunk ports on ICX switches - is this possible?
I have several Ruckus ICX7150-12P switches, running 08.0.92d (SPR08092d.bin).Our router is a pfSense.I'm trying to setup trunk ports to act as uplink ports between the ICX switches.I'm... (continued)
Can I run 2 R510's off 2 Netgear switches?
I purchased a Lennar home last year and it came with an ICX7150 switch and 2 R510 AP's running Unleashed with mesh configuration. Unfortunately, the house was built upon wireless... (continued)
ICX series Switches are suporting PAT(Port address translate) or NAT(Network Address Translate) ?
I can't find this contents in datasheet & Ruckus FastIron Administration Guide, Does ICX7450 switch require a lincense to use NAT funtion ?
Is there a way to configure multiple switches at once? Specifically the ICX7250 versions?
Switch Config
IPv6 Prefix Delegation Support on ICX Switches
Greetings! I'm in the process of setting up IPv6 in a dynamic environment, and I am wanting to be certain that I'm not missing something. From what I can tell, it is NOT possible to... (continued)
Ruckus ICX 7150-48ZP configuration help
We have a Ruckus ICX 7150-48ZP connected a server (eth 1/1/1), and two Cisco switches A and B (eth 1/1/47 and 1/1/48). We want to configure the Ruckus ICX 7150 switch only to... (continued)
Confirmed working 802.3at switches for R710?
Are there any switches that are confirmed to "just work" maybe even out of box via default settings? It seems majority of posts on here are switches that don't work.
How to auto-provision Brocade switches by DHCP
Going through the documentation (which is pretty shoddy) I can't seem to figure this out. My best guess, from what I've read, is:Unzip firmware distribution into TFTP server rootAdd... (continued)
Lost POE on two 6450 switches after power outage
Lost POE on two 6450 switches after power outage.Have multiple ICX 6450 switches deployed in a large store in Oregon. Thanks to power outages last night... all the switches... (continued)
RUCKUS ICX 7150 24P SWITCH UNSTABLE, SWITCHING ON AND OFF PORTS
Hello guys, First of all, i would appreciate any workaround that anyone could give me. I have a large Switch network for a LAN of a univerisity campus here. This network is mixed... (continued)
Ruckus ICX 7150 & R510
I just moved into a new home by Lennar and they have 1 ICX 7150 and 2 r510s installed in the house. I have ATT Fiber, ATT provides a modem/router which connects to the ICX 7150 and the... (continued)
ICX
What is the scope or management and configuration functions that can be done on ICX switches through the SmartZone controller?
MPLS - First time I am configuring and MPLS circuit with Ruckus switches. Any tips or suggestions?
First time we are working with an ISP and programming a MPLS circuit or "Vlan product" or "ring" which ever you want to call it. Any suggestions or help programming both the switch and the core?
Ruckus Smartzone 300 and Arista network switches compatiblity, Does Smartzone 300 support NAC or Posture Assessment?
Hi, We were planning to implement ruckus wireless solutions with the smartzone 300 controller. I heard also the smartzone can manage the wireless APs and the wired switches.... (continued)
Ruckus 7982 issues on Cisco 3750PoE Switches
I have a Cisco 3750PoE-48 network at all of my stores. Sometimes a ZF7982 will stop communicating with my ZD3000 causing service outages at that location. I have found only 2 things... (continued)
ICX 7150 upgrade
Hi,I did understand that there is a two tier approach to upgrade the firmware to the latest UFI code.The recommended SW is:I assume the R means router... (continued)
ICX 7150-48ZP & LRM
I have a number of the 7150-48ZP that we just deployed. In the past (with another vendor switch) we used LRM SFP+ for connecting wiring closets. We put in the 7150's a... (continued)
ICX 7450 router
I new at Brocade and I have ICX 7450-24p with 3 module fiber.=====telnet@DIST-BRU(config)#show running-configCurrent configuration:!ver 08.0.30hT211!stack unit 1 module 1... (continued)
ICX Questions
Hi,I have few questions about ICX1. I want to do rollback if I didn't save manuallyin Aruba using these command alias, save, job2. I want to save config without credentials. This useful... (continued)
Ruckus ICX 7750 IPV6 hardware support forwarding
Hello dears,The ICX 7750 switches supports IPv6 in hardware, in order to provide wire-rate forwarding for IPv6 packets?Thank you!
Ruckus AP with multi SSID into ICX Switch
Longtime user of Ruckus AP's, but new to the ICX switches. I've been using the ICX Switches in test-bench scenarios to see how I like them before deploying them wide spread. ... (continued)
ICX 7450 stack with ~100 access switches connected and ~250 VLANs
Hello to All,I'm going to design and deploy network infrastructure in huge building based on Brocade ICX switches and other vendor switches (let's say "MS switches"). As I'm new at... (continued)
There is any password restriction for ssh in ICX7150/7250 switches?
We have a new standard from our Project Managers regarding users passwords in ICX7150/7250 Switches. They want us to use something like !P@ssw0rd! (with some characters between... (continued)
Switches using Router code vs Switch code and decision making
Hi all,When an ICX switch is on router code, is every packet a forwarding decision even if the ICX device is on a switched circuit on layer 2? If the ICX switch is not performing the... (continued)
ICX 6610/7450,MLXE-8 & VDX 6740 training
Hello all, I am new to current position and coming from a Systems Admin position. I am looking to get training for the listed items (ICX 6610/7450,MLXE-8 & VDX 6740), to help... (continued)
Announcement: Ruckus ICX FastIron 08.0.92 (GA) Software Release is available on Support
Greetings,
I’m happy to announce a new GA Release of Ruckus ICX FastIron 08.0.92 for 7150, 7250, 7450
7650, *7750, and 7850 model switches. *ICX-7750 is again... (continued)
Does Ruckus switches cache mac addresses for a certain time on the network?
Does Ruckus switches cache mac addresses for a certain time on the network? I was working with soemone the other day and they unplugged there computer from network but I could still... (continued)
Cannot connect Ruckus ICX7750 to Huawei CE6810 via 40G QSFP+
I have an ICX7750-48C copper switch that seems to work just fine on its own. I also have a Huawei CD6810 fiber switch that works beautifully on its own. Each of these switches has QSFP+... (continued)
Announcement: Ruckus ICX FI 08.0.91 (GA) is posted to Support
Ruckus ICX FastIron developers and Quality Assurance are pleased to announcea new FI 08.0.91 (GA) firmware release for ICX 7150, 7250, 7450, 7650, 7850 modelswitches. Three new models... (continued)
Mix stacks of ICX 7650
Hi everyone, question..I was planning to design a mix stack of Ruckus ICX 7650-48ZP and ICX 7650-48P will that be possible?And also, I am reading on datasheet about notes... (continued)
ICX 7150 48P - VoIP Phones
Good morning,I have 2 ICx 7150 switches in stack.This is my configCurrent configuration:!ver 08.0.80dT211!stack unit 1 module 1 icx7150-48p-poe-port-management-module module... (continued)
ICX 7450-48P POE issues
Installed over 200+ 7450's with ip phones and cameras connected to switches. Currently we have several that are "working" sort of. Essentially POE is working great until I had to... (continued)
ICX 7750 Recommended Firmware
We have a pair of (Brocade) ICX 7750s working as our core routers (we are using MCT, BGP, OSPF, VRRPe). We are currently running firmware version 08.0.30h. We noticed that according to... (continued)
ICX 7150 to Ruckus ZD1200 w/H510 WAP
hello Newbie question.I am trying to connect a ZD1200 via an ICX 7150 switch to H510 APs. vlan 1 is native /Vlan 20 public ssid /Vlan 30 for members / Vlan 40 for media and... (continued)
Unable to boot image to Ruckus ICX 7150
Hi Everyone, Please help me about booting image from USB or TFTP server to Ruckus ICX 7150. This issue arised when I deleted flash of both primary and secondary with reload while... (continued)
Ruckus 7150 ICX Switch (Lennar) expansion???
I am out of space on my Ruckus ICX 7150 that Lennar installed. What would I use to expand the number of ports on the switch? We pre-wired for a lot of ethernet stations and... (continued)
Why Ruckus?
We are a public school district looking to do a complete overhaul of our wireless network. A bit over 725,000 square feet of indoor space, 4,300 students with nearly 1,400 students in... (continued)
Can I configure snmp on cloud managed switches?
I have a compact 12-port switch here that I've set up with the Ruckus Cloud. I'd like to monitor it with SNMP, but it looks like it might be disabled and the cloud has also disabled my... (continued)
ZoneDirector 3000, AP R700, and 3com 5500 switches
We are in the process of having a Ruckus wireless network installed. There has been some delays, so I am looking to get switch configurations in place to try and speed up the overall... (continued)
If I have multiple locations is there a campus director or something to sync everything between all locations?
I have about 8 locations. All with Ruckus APs. We have a Blacklist and whitelist at our main location. We'd like that information along with password... (continued)
Large campus network: best practices for Airplay (+ issues with lots of Apple TV's)
We have a large campus network: ZoneDirector ZD1200, ± 50 AP's R500 and R510, ± 100 Apple TV's, lots of iPads (1:1 and shared iPads). The Apple TV's and iPads are on the same SSID, but... (continued)
ID | Title | Version | Release Date | Edit Date |
---|---|---|---|---|
20230808 | CVE-2023-39904, CVE-2023-39905, CVE-2023-39906: ICX XSS and CSRF Vulnerability | 1.2 | August 08, 2023 | August 14, 2023 |
20250218 | CVE-2024-50607, CVE-2024-50604: ICX Directory Traversal and Image Integrity Check Vulnerability | 1.0 | February 18, 2025 | February 28, 2025 |
Technical Support Bulletins
ID | Title | Version | Release Date | Edit Date |
TSB-2023-001 | High CPU Utilization with SmartZone (SZ) | 1.0 | 2023-05-26 | |
TSB-2023-004 | AAA login default action | 1.0 | 2023-07-10 | |
TSB-2021-002 | After upgrading to 8.0.95c, stack port does blocks traffic | 2021-04-02 | ||
TSB-2024-001 | TSB-2024-001-ICX8200-CRC-InErrors-Passive-Twinax | 2.0 | 2024-03-13 | 2024-04-18 |

Ruckus ICX8200 Campus Switch
The RUCKUS ICX 8200 Switch series is purposely designed to handle next generation wireless first and IoT campus networks. These intelligent, scalable edge switches deliver enterprise-class functionality at an affordable price without compromising performance and reliability. The RUCKUS ICX 8200 raises the bar with up to 8×25GbE ports for uplinks or stacking, PoE++ (802.3bt), VXLAN, advanced L2/L3 features and market-leading stacking density with up to 12 switches per stack. In addition, the RUCKUS ICX 8200 combines enterprise-class features, manageability, performance, and reliability with the flexibility, cost-effectiveness, and “pay as you grow” scalability of stackable solution.
×